News article category
Project
Over recent months GEO-Instruments engineers have been conducting an array of essential monitoring works on Docklands Light Railway (DLR) tunnels in Central London.

The survey teams conduct levelling runs and 3D surveys simultaneously
Undertaken during engineering hours early in the morning, these comprehensive monitoring visits include Condition surveys, 3D monitoring surveys using retro targets, Levelling runs, and track geometry surveys using an Amberg GRP 3000 track trolley.
These multidisciplinary visits are an efficient way to gather vital information on Tunnel and track condition in the brief windows of time allowed by the busy transport network.
Find out more about our monitoring of key London infrastructure.
An Engineer conducting a track geometry survey
Published on